Hello! Welcome to visit the official website of Kelong Environmental Technology Co., Ltd.!
PRODUCTS

Spray Tower Scrubbers

PP Wet Scrubber Tower for Acid and Alkali Exhaust Treatment

  • Model: ZL-PP-ST Series
  • Specification: Flame-retardant PP wet scrubber tower for corrosive exhaust
  • Size: 3000 to 70000 m3/h airflow options
  • Price: Contact us
  • Description: PP wet scrubber tower for acid gas, alkali exhaust, odor and corrosive industrial waste gas treatment with airflow options from 3000 to 70000 m3/h.
  • Online ordering

Need equipment sizing or a price quote?

Send airflow, pollutant type, material preference, voltage and destination. PureAirTek will recommend suitable industrial equipment and quote range.

A PP wet scrubber tower is used for corrosive acid gas, alkaline gas, soluble odor and wet exhaust pretreatment. Polypropylene construction provides strong corrosion resistance for many chemical and surface treatment applications while keeping equipment weight and cost practical.

Best-Fit Applications

ApplicationPollutantWhy PP Fits
Electroplating and surface treatmentAcid mist and alkaline gasPP resists many corrosive gas and liquid conditions.
Chemical storage or dosing roomsCorrosive odor or soluble gasWet contact and pH control can reduce soluble pollutants.
Laboratory exhaustMixed low-concentration corrosive gasCompact tower design can be customized to lab airflow.
Wastewater station odorWater-soluble odor componentsOften used before activated carbon polishing.

Limits of PP Scrubbers

PP scrubbers are not designed for high-temperature exhaust beyond material limits, strong oxidizing chemicals without review, heavy dust slurry without sludge planning, or non-water-soluble VOC as a final treatment solution. If the exhaust contains solvent VOCs, a downstream activated carbon, RCO or RTO stage may still be required.

Core Design Points

  • Correct tower diameter to control gas velocity.
  • Spray nozzle layout for uniform liquid distribution.
  • Packing or contact section for enough gas-liquid contact time.
  • Demister to reduce liquid carryover.
  • Circulation tank, pump, dosing and blowdown planning.

Selection Parameters

ParameterWhat to ConfirmDesign Impact
AirflowTotal exhaust volume and collection pointsDetermines tower diameter, height and pump capacity.
Gas compositionAcid, alkali, chlorine, ammonia or mixed gasDetermines scrubbing liquid and pH control strategy.
TemperatureNormal and peak temperatureChecks whether PP is suitable or another material is needed.
WastewaterCan the factory handle blowdown?Affects real operation feasibility.
Downstream stageFinal exhaust or pretreatment before carbon/RCO?Determines outlet mist control and efficiency target.

Quotation Data to Prepare

Prepare airflow, pollutant names, concentration if available, temperature, humidity, pH tendency, required removal target, wastewater handling condition, installation space, voltage and destination country.

Related Equipment